Call one of our experts today: 1-800-307-9218 1-800-307-9218
Contact Us

VFI-2580 Aliphatic Top Coat

VFI-2580 Aliphatic Top Coat is a solvent-based, single-component clear coating made to go over polyurea and polyurea hybrid coatings. As an aliphatic, it is chemically UV stable which allows it to protect and extend the life of other non-UV stable surfaces. It has a unique ability to penetrate and coat the surface to preserve the color and gloss of the existing coating. VFI-2580 can be applied by roller or spray and has a fast-setting time that allows it to cure in less than a day.

  • Excellent color stability and UV weathering characteristics
  • Excellent adhesion to existing polyurea and polyurea hybrid coatings
  • Durable yet flexible finish to withstand abrasion and impact
  • Good chemical resistance for application in harsh environments
  • Long-term protection of exterior surfaces
Physical Properties Test Method Test Results
Hardness Shore D ASTM D2240 67 D
Tensile Strength ASTM D412 8,255 psi
Elongation ASTM D412 15%
Tear Strength ASTM D624 280 pli
Yield Strength N/A 7,611 psi
Elastic Modulus N/A 62,748 psi
Flexibility @ 15°F Mandrel (Pass/Fail) N/A Pass
Permanent Set N/A 5%
Liquid Properties Test Method Test Results
Solids by Weight ASTM D1644 41.50%
Solids by Volume ASTM D2697 36.50%
Mixed Liquid Density N/A 7.84 lbs/gal
Mixed Specific Gravity N/A 0.094 g/mL
Mixed Viscosity N/A 550 cps
Tack Free N/A 2 hours
Recoat Window N/A 4-48 hours
Place into Service N/A 36 hours
Flash Point N/A 115°F
VOC N/A 550 g/L

Application Requirements

The surface temperature should remain between 40°F – 100°F during the application process. Apply a wet coat at a minimum of 5-10 mils thick. The higher the applied film thickness, the better the UV resistance of the base coat. Additional coats can be applied after the first coat has cured for about 4 to 6 hours. The time it takes for the coating to set will depend on film thickness, liquid material temperature, relative humidity, and substrate temperature, so allow a minimum of 4-8 hours before light use. Place into service after a minimum of 4 hours.

Surface Preparation

All surfaces must be clean and free of oils, dirt, or films for ensured coating adhesion. Remove dust using compressed air, a brush, or a rag, and wipe the substrate with MEK or another approved solvent. Primer is not recommended for most applications. The surface must be uniform, sound, and suitable for the coating. If the surface is aged, lightly sand or rough it up for coating adhesion. The surface must be dry before applying the clear top coat. VFI-2580 experiences the best results when applied to a surface with a hardness greater than 50 D and before the previous coating recoat window has expired.

Equipment

VFI-2580 can be applied by HVLP sprayer, single component spray equipment, or rollers.

Cleanup

VFI recommends cleaning application equipment with xylene or MEK.

Storage/Shelf Life

Store between 60-90°F in a clean, dry building. The shelf life of unopened containers is 12 months after the date of manufacture. Opened containers can be resealed with a nitrogen purge, but the material shelf life will significantly shorten.

Precautions

VFI-2580 contains isocyanate and VOCs over the EPA-regulated amount at 550 g/L. Isocyanate can be irritating when in contact with the skin or toxic if inhaled as particulate matter. Wear proper PPE, including an approved respirator, to avoid prolonged breathing of vapors and repeated skin contact. As a highly flammable liquid and vapor, all safety directions must be followed to prevent hazards. Use only outdoors or in a well-ventilated area. Do not thin or add foreign material to this product. See Safety Data Sheet for all safety information.

At VFI we offer solutions to all your project needs. With a talented onsite lab staff, we can customize our products to suit your application requirements. Contact us today to learn more about our custom solutions!